Room addition, Room addition builder, Custom homes, New home builder, Eco friendly General Contractor, Southern California
Site Map     
Room addition, Room addition builder, Custom homes, New home builder, Eco friendly General Contractor, Southern California
click here to view our galleries

orange innovations - home
orange innovations - room additions
orange innovations - remodeling
orange innovations - cost calculator
orange innovations - testimonies
Visual Demo
Job sight
orange innovations - Get Loan
orange innovations - contact us



Share |
 
 

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player


Orange Innovations plan, design and build:

Foundation

Framing

Electrical

Doors & Windows

Insulation

Roofing

Plumbing

Decking

Kitchens and Baths

Most homes in southern California are built on "Slab-On-Grade" or "Raised" foundations. To ensure that the addition will look & feel an authentic part of the house, It is most recommended to maintain the same type of foundation throughout the house.

Slab-On-Grade: This type of foundation would usually include concrete slab surrounded by concrete footings, and should include all the following stages

:

Slab Detail
Staking & Forming:
Lumber boards secured by stakes are being installed around the perimeter. The size, location & squareness of the slab (and subsequently the entire addition) are being determined at this highly important stage.
digging square footings  Digging the footings  stakes are being installed around the perimeter  trenching for footings  Strait line formed
Grading:
The area of the addition is graded to approximately 6 inches below the level of the existing slab.

Slab Demolition  Soil Compaction   Havy Duty Grading  Grading Slab Foundation  Grading for foundation

Footings:
Ditches are being dogged around and across the new pad. Depending on the city's requirements, type of soil, and height of structure: the footings are typically 24 to 30 inches deep, and 12 to 18 inches wide. Interior footing are laid under interior bearing walls.

digging the footings  flush the footings  Trenches for footings   Footings excavations  Footings excavations

Vapor barrier:
To prevent access of moisture from the soil onto the new slab, a 10 mil polyethylene sheet is placed over the pad & into the footings.

Vapor Barrier Material  Vapor Barrier in the footing  Vapor Barrier Slab Foundation  Vapor Barrier Slab Foundation  Vapor Barrier Slab Foundation

 

Sand bed:
2 inches of sea sand under the concrete will provide flexibility and sustainability to earth moments.

 Sand Layer Under Slab  flush the footings  Sand Layer Under Slab  Rebar the Foundation  Sand bed is being laid under the vapor barrier

 

Steel reinforcing bars:
1/2" Rebars (AKA #4 Rebars) are laid and tied across the slab, spaced 16 inches on center each way. The network is placed on 2"X2" concrete "Dobie" blocks, to ensure its positioning inside the slab (and not under).

  #4 Rebar In The Footings  Rebar System In The Slab  Rebar System In The Slab  Rebar the Foundation  Rebar the Footings

 

Concrete Pour:
PreMixed concrete is being pumped into the ditches and over the pad. The finishers will level the "mud", and work the surface, until its dry, to ensure smooth finish.

 Pouring the concrete into the footings  Pouring the concrete slab  Pouring the concrete slab  Screeding concrete slab  Screeding concrete

Curing:
Slow curing concrete = stronger slab, and since Concrete is a thermal curing material (which means, it projects heat while drying), it is highly recommended to water-spray the new slab a few times a day, for the first couple of days.

 

Raised Foundation: There are many types of "Raised floor" systems, but the most common one in southern California these days is designed with concrete stem-wall & pier supported girders.

Raised foundation detail

Grading:
The area of the addition is graded to 18 inches below the bottom of the floor joists of the new addition.
Footings:
Ditches are being dogged around to form the new footings.

 

Piers:
Square holes are being dogged where new concrete piers will support the girders.

Forming:
Lumber boards secured by stakes are being installed around the perimeter to form the shape on the new concrete stem walls.

Forming stem walls  Forming footings  Forming raised footings  Forms ready to pour  Raised forms

 

Steel reinforcing bars:
Horizontal & vertical re-bars are laid and tied inside the forms to provide longitude reinfor

 

Concrete Pour:
PreMixed concrete is being pumped into the forms and pier holes. The finishers will work the top to ensure leveled walls.

The concrete is being poured into the pad holes  The concrete is being poured into the pad holes  concrete is being pumped into the forms  Forms filled up with concrete  Forms removed once the concrete is dry

Free PHP scripts - Download unique free PHP scripts for your website!

Back to top




Site MapHomeBlogRoom AdditionsRemodelingCost Calculator
TestimoniesGalleriesDirectory linksContact Us

San Diego: 888-744-4489  Woodland Hills: 818-201-7528  Irvine: 949-737-1695

Toll Free: 888-744-4489        email:
info@orangeinnovation.com

Designed and developed by Master Solution.



room addition - California, Los Angeles, San Diego, Chula Vista, San Francisco, Long Beach, Fresno, Sacramento, Oakland, Santa Ana, Anaheim, Riverside, Stockton, Modesto, San Jose, Fremont, Glendale, San Bernardino, Huntington Beach, Oxnard, Irvine, Ontario, Oceanside, Garden Grove, Moreno Valley, Santa Clarita, Rancho Cucamonga, Fontana, Sunnyvale, Santa Rosa, Salinas, Corona, Pasadena, Hayward, Escondido, Orange, Fullerton, Palmdale, Pomona, Thousand Oaks, Concord, El Monte, Simi Valley, Vallejo, Inglewood, Costa Mesa, Downey, Covina, Norwalk, Visalia, Burbank, Ventura, Fairfield, Roseville, South Gate, Vista, Richmond, Berkeley, Antioch, Elk Grove, Daly City, El Cajon, Mission Viejo, Santa Barbara, San Mateo, Visalia, Vista, Carson, Westminster, Alhambra, Hawthorne, Santa Monica, Whittier, Roseville, Rialto, Lakewood, Buena Park, Carlsbad, Santa Maria, Redwood City, Livermore, Bellflower, Napa, Alameda, Newport Beach, Lynwood, Clovis, Upland, Chino Hills, Union City, Merced, Walnut Creek, Victorville, Merced, Pleasanton, Redlands, Pico Rivera, Redondo |Beach, Milpitas, Hesparia, Montebello, Laguna Niguel, Huntington Park, Davis, Monterey Park, La Habra, Yorba Linda, Hemet, Lake Forest, Palo Alto, Encinitas, Gardena, Temecula, Camarillo, Lodi, Tracy, Pittsburg, Diamond Bar, San Rafael, Turlock, Cerritos, Fountain Valley, San Marcos, La Mesa, Santa Cruz, Petaluma, National City, Apple Valley, Rosemead, Arcadia, Santee, Folsom, Paramont, Cupertino, Alameda County, Contra Costa County, Imperial County, Kern County, Los Angeles County, 
Ventura County, Fresno County, Marin County, Merced County, Monterey County, Orange County, Riverside County, Solano County, San Bernardino County, Sacramento County, San Diego County, San Francisco County, San Joaquin County, Stanislaus County, San Luis Obispo County, San Mateo County, Santa Barbara County, Santa Clara County, Santa Cruz County, Sonoma County